At the overview assembly of the Nuclear Regulation Authority held on the third, Hokuriku Electric Power Company’s declare that the fault passing via the location of the Shika Nuclear Power Station in Ishikawa Prefecture was “not an energetic fault” was usually accepted. Seven years in the past, relating to a part of the fault on the premises, the opinion expressed by the skilled assembly of the Regulatory Commission that “the potential of motion sooner or later can’t be denied” was modified, and Hokuriku Electric Power Co. The overview of Unit 2, which goals to begin operation, will progress.
Source