After a heavy snowfall in January precipitated trains to be caught for an extended time period with out working tools to soften the snow on the tracks, JR West determined that there was a chance of snowfall any longer, and hastened to work to place the tools into operation. Therefore, the JR Kyoto Line and different strains have been briefly suspended, however after 6:00 pm, all strains resumed operation.
In addition to the potential of snowfall on the fifteenth, JR West didn’t function a tool that melts snow at factors on the monitor primarily based on the anticipated quantity of snowfall in January, and the practice was caught and passengers have been killed. In mild of the truth that folks have been confined for an extended time period, it was determined to hurriedly function a snow-melting system round Kyoto Station.
Along with this, some sections of the JR Kyoto Line, Biwako Line, Kosei Line, and so forth. had been suspended from 5:00 p.m., however after 6:00 p.m. resumed.
Source

