Regarding the Linear Chuo Shinkansen, whose building has been delayed in Shizuoka Prefecture, the Ministry of Land, Infrastructure, Transport and Tourism authorised on the twenty eighth JR Tokai’s plan to vary the opening date from 2027 to 2027 or later. Did.

