The Ministry of Land, Infrastructure, Transport and Tourism has introduced that Runway C at Haneda Airport, which was closed as a result of collision between two plane on January 2nd, will resume operations at midnight on the eighth.
The Ministry of Land, Infrastructure, Transport and Tourism has introduced that Runway C at Haneda Airport, which was closed as a result of collision between two plane on January 2nd, will resume operations at midnight on the eighth.